design thinkers blog
expertise
 
 
[photo]

Design Build

In 1996, 25 years ago, we introduced a better way to build. We provide clients with a single source of responsibility to design and build their projects. Our integrated team continues to offer a high degree of quality and efficiency, aspects that were lacking in traditional contractor-led design build projects.  Our team of planners, programmers, designers, estimators and builders work collaboratively to produce faster, smoother and less costly projects, tailored to our clients’ needs. We work open book, guarantee cost, and return unused contingency funds incrementally, giving clients additional savings.

↓

WORK

Check out some samples of our work below.

[case study]
Kent School, Hoerle Hall
New Dormitory, Faculty Housing & Academic Building
[case study]
Town of East Haven
Patsy DiLungo Veteran’s Memorial Ice Rink
[case study]
Chapel Haven
Residential / Education Facility (REACH)
#Design Build
[blog post]

SLAM wins three CBC Project Team Awards

GLASTONBURY, CT., May 10, 2022 – SLAM (The S/L/A/M Collaborative) has been recognized by the Connecticut Building Congress (CBC) for three Project Team Awards, winning for outstanding building projects in the healthcare and education markets that exemplify teamwork excellence and best practices by project owners, architects, engineers, constructors, and trades. The CBC Project Team Awards will be presented on June 14, 2022, at The Aqua Turf Club in Plantsville, CT. 

[blog post]

SLAM Construction Services receives 2021 DBIA New England Award

GLASTONBURY, CT – March 9, 2022 — S/L/A/M Construction Services (SLAM CS) received the Design-Build Institute of America New England Region (DBIA NE) Gold Award for the design and construction of the Chapel Haven Schleifer Center SAIL building project, located in New Haven, Connecticut. SLAM CS accepted the award at the 2021 Design-Build Project Awards Banquet held on March 3, 2022, at the Sheraton Framingham, Massachusetts.

[blog post]

JANUARY 2022 New England Material Cost & Lead Time Trends

Our sources are reporting that factory health restrictions and labor shortages are causing delays in production which result in long lead…

Contact

[headshot]
Eugene Torone
President / Construction Services

P
860 368.4233